Basic Engineering Package Design
Case 1: Alkyl Amines Chemicals LimitedPlant design for production of Y TPD of product X*Problem StatementTo design a plant for Y tons per day of production of product X for Alkyl Amines Chemicals Ltd.ApproachThe project involved the complete …

Design-Build for a Class 1 Div 2 Suite
Case 2: Teva PharmaceuticalsSituation:The client was developing a sterile API that classified as an OEL 4 potent compound using solvents. This would warrant a manufacturing suite, which was clean and capable of handling solvents as well as potent …

RO WATER SYSTEM OPTIMIZATION AND HYDRAULIC MODELLING USING FATHOM
Case 3: Genzyme CorporationSituation:The Genzyme Allston Landing Facility (ALF) is a bulk biologics manufacturing facility located in Allston, MA. Historically, low level excursions were observed for the existing RO and WFI storage tanks during …

REDLINING AND UPDATING P&IDS
Case 4: Chemtura Corporation (Hatco Division)Situation:The client is a unique producer of specialty chemicals located at a 75 acre site in New Jersey. Panorama’s client was the purchaser of the facility and realized that most of the P&IDs …

CIP Time Optimization
Case 5: CIP Time Optimization for a facility for Bristol Myers SquibbSituation:Current CIP time for cleaning a reactor system at a BMS site was 12-13 hours. This long cleaning time, was a major concern for the client because this substantially …

Design-Build Project in an existing facility
Case 6: Genzyme Corporation - Design Built ProjectSituation:A pharmaceutical major based out of USA has a running facility located in Framingham, MA. Client wanted to build a suite for Part washer and Glass washer in this running facility with …

Process Changes to solve corrosion issues
Case 7: P&G / The Gillette CompanySituation:The existing process water system located in P&G/Gillette Powerhouse exchanges process (cooling) water with sea water from four point channel in order to provide cooling water for various process …

Distillation column train simulation and optimization
Case 8: Chemicals manufacturing facility at Vapi GujaratSimulation of continuous distillation columnsSituation:A chemicals manufacturing company was in the phase of modernising its 25 year old plant. The currenttrain of distillation columns …

Solvent dispensing and waste collection system
Case 9: Vertex PharmaceuticalsSituation:The client had a multi-story building with retail space on ground level and research labs on 2nd, 3rd and 4th levels. The client wanted to set-up a central solvent dispensing system to supply five different …

Conceptual Engineering for ABC Single Use Suite for biologics
Case 10: Abbott Bioresearch CentreConceptual Engineering for ABC Single Use Suite for biologicsProblem StatementTo undertake complete conceptual design for the ABC Single Use Suite for biologics at Abbott’s Bioresearch centre at Worcester, …